info@c2cconstructionsolutions.com | 315-801-5185 | 110 Lomond Court, Utica, NY 13502

Butler Buildings

Whether it's a Butler building for commercial, manufacturing, or warehousing and distribution, we assure the highest quality, fastest delivery, and competitiveness that our clients deserve.

As a Butler "Career Builder", we have completed nearly 3 million square-feet of Butler building projects for satisfied clients in Central and Northern NY, primarily on a Design-Build basis. 

Among the many clients and projects for which we have constructed Butler pre-engineered buildings include American Alloy Steel, Rome, NY; PLC Trenching, Clinton, NY; Harley-Davidson Stores for the Carbone Auto Group in Yorkville & Amsterdam, NY; Northern Safety Co., Meyda Tiffany, and Tri-Valley Beverage all in the Utica, NY area. We have also been involved in many other smaller projects and renovations of all sizes.

We normally self-perform all concrete foundation and building erection with our own forces, not sub-contractors.

Manufacturing

As a Butler Builder® since 1982, we have completed nearly 3 million square-feet of new Butler and conventional Design/Build buildings and renovation projects. Over the last 35 years, we have erected many manufacturing, warehousing and distribution facilities from 2,000 to 150,000 square-feet for satisfied clients throughout Central and Northern New York.

JBF Stainless

JBF Stainless

In 2017 , Jake Feldmeier, founder of JBF Stainless contacted us to look at (2) options for the growing business of Stainless Steel tanks for the Beverage Industry. Having been located in a leased facility we looked at expansion in to the adjacent vacant space with an addition vs. a totally new facility. After working up figures on both it was decided to pursue the new facility on a site in Frankfort  NY at the "Pumpkin Patch" Industrial Park, adjacent to Heidelberg Bread,  which we built in 2016. Construction started in the spring of 2018 and was completed in December of 2018

The unique 43,000 sf facility includes a 60' clear height High Bay Fabrication and Shipping  area with (4) 15 ton Bridge cranes, which allows fabrication of the large tanks vertically. The Low Bay area includes (2) Gantry cranes, smaller equipment, and a Receiving area. Also included is a 3500 sf Office Headquarters with a Storage Mezzanine above.

Congratulations to the team at JBF for the move to the new facility.    

 

View more
Precisionmatics Manufacturing Facility

Precisionmatics Manufacturing Facility

The Design-Build project is a (6) unit Butler building. The units include the Main plant, Offices, High bay for material receiving and storage with a bridge crane, a (6) Bay Scrap Dock, and Truck Canopy.

View more
Syracuse Label

Syracuse Label

This project involved the construction of a new 63,000 SF facility that included a 49,000 SF Butler Building Production/Warehouse with a large 14,000 SF conventional built office area attached to the Butler Building that now houses their main operations.

 

The $7.6 Million project had an aggressive 6 month construction schedule with liquidated damages. Site work commenced on May 9, 2016 and substantial completion. The ensuing Certificate of Occupancy was attained on October 31, 2016.

 

Some of the features of the new Production/Warehouse space included several large Bridge cranes, (2) new Loading docks with Dock Levels, a new Dimplex Chiller to help in their printing operations, new LED lighting and several large curtain walls to allow the influx of natural lighting.

 

The office space is complete with a new lobby/reception area, (2) large conference rooms, (2) open office areas complete  with a dehumidification/misting system, several large individual office that run the perimeter of the office space, and a Showcase Room that will allow the owner to display numerous awards.      

View more

Heidelberg Bread

This 28,800 SF Baking Facility for Heidelberg Bread, was the very first building in the Herkimer County IDA's "Pumpkin Patch" Industrial Park located in Frankfort, NY. The building replaces the original Heidelberg plant in Herkimer which the company had outgrown due to its continued growth and high demand for the artisan bread products they have produced since 1983.

 

The project was completed on a Design-Build basis that included Site, Structural, Architectural and Mechanical/Electrical design and construction. The building includes separate Production and Packaging areas, Hi-R value Insulated Metal Wall and Roof Panels, Staff offices and support facilities.

View more
American Alloy Steel

American Alloy Steel 2015 Expansion

The 63' x 325' addition includes (2) 20 ton bridge cranes, for a total of (8) cranes in the facility. We are proud to continue our relationship with this Houston, Texas based client.

View more
Feldmeier Equipment

Feldmeier Equipment

In February 2014, we completed the construction of the new 44,000 sf Manufacturing Plant for Feldmeier Equipment in Little Falls.

View more

SR Sloan

Our relationship with this client began in 1999, when Mr. Steve Sloan began pursuit of expanding or relocating his families' wood truss and stair business, which was located in several small buildings which they were outgrowing rapidly.

 

Over the next few years, we pursued expansion at the existing site, a new site near the existing, and relocation to an existing vacant plant. In 2005, we put Mr. Sloan together with a local land owner and site contractor, Mr. Fred Burrows Jr., who owned a new 100 acre site, at the intersection of the new Judd Rd. extension, NYS 840, and Halsey Rds. in Whitestown, and eventually negotiated this new 63,000 square-foot Design-Build project. This was the first project at this site which now includes a new access road, utilities, and space for future development.

 

The state of the art facility includes 35,000 square-feet of Truss Production, 4,000 square-foot Truck Maintenance area, a 15,000 square-foot Stair fabrication shop, 7500 square-feet of new Office and Plant support rooms, a 5 acre exterior material storage area, and new manufacturing equipment.

View more

Utica Converters

After years of legal and environmental delays, finally in the year 2000 the City of Utica demolished the abandoned factory and prepared the site for re-development. We teamed with Butler Real Estate to offer a Design/Build-Lease project that was ultimately accepted by the City, the NYS D.E.C., and Utica Converters. The 96,000 square-foot project was completed in less than 6 months, a month ahead of schedule.

 

Utica Converters, a subsidiary of Goodyear Tires of North America, produces polyester cord materials used in tires and will add several jobs due to this expansion.

View more

F.X. Matt's Brewery - Bio Digester

We have completed (2) Buildings, Foundations, and Site Work for this exciting "Green" project that will process the brewery's waste water to produce methane gas that will in turn power a generator that will provide up to 50% of the electrical needs of the brewery. 

We served as the Design-Builder for the 5,000 sf Pump House, the 2,000 sf Bio-Gas Storage including a 12,500 cubic foot concrete containment tank, and (2) Large Tank Foundations, one 280 cy and another 165 cy, as well as the complete Site Work for Utilities, Storm Water and Site Improvements.

Lead designer of the Digester System is EMG International based in Philadelphia, Pa. 

We are proud to have served the brewery again following the new Warehouse and Fire Re-Construction in 2009.

View more

Meyda Tiffany

This 83,500 square-foot Butler Building expansion for Meyda Tiffany in Yorkville, NY began on site in early August of 2000. The planning process, however, began nearly (2) years earlier when the owner of this manufacturer and distributor of stained glass products, contacted our office to discuss his expansion needs. The relationship between our firms had begun in 1993 when Meyda purchased an abandoned 60,000 square-foot facility and contacted us to replace a 24,000 square-foot area with a new pre-engineered building. We were successful in completing that design/build project and were able to build on our relationship to obtain this new project, which will more than double the size of the current facilities. The new project includes a 63,380 square-foot manufacturing and warehouse area with a 5,600 square-foot first floor showroom, 5,600 square-foot second floor photography and office area, as well as a 7,800 square-foot warehouse mezzanine. Once the showroom is complete, we will renovate the existing offices and showroom to a new 7,000 square-foot office area. The warehouse and manufacturing area is scheduled for completion in December 2000, the showroom for February, and the office renovations for April 2001.

View more

F.X. Matt's - Tanker Dock Addition

We have continued our relationship with the FX Matt Brewing Co.  to design and build this small but important addition to facilitate Tanker trucks that deliver and ship beer to the facility.

 

The Butler addition includes room for (2) Tanker trucks with provisions for oil/water separation and containment, wash down, ventilation, heat and electrical.

 

View more

Empire Recycling

A 7,000 square-foot Butler building to house bulk aluminum for processing by a new shredding machine, was completed in 2007. The project included installation of over (230) wood and steel piles to support both the building and the exterior equipment. Following completion of the piles, we installed over (230) cy of concrete for building and equipment foundations, as well as structural slabs.

The Load Out building featured a 30' eave height, clear span, with 12' high concrete and steel protection walls.

Upon completion of the building, we also completed a re-siding project of the original storage buildings to match the look of the new building.

View more

Mobile Climate Control

In the Spring of 1997, Mobile Climate Control Corporation, a Toronto, Ontario based Manufacturer of heating and air conditioning systems for Urban Transit and Military Vehicles sought a N.Y.S. site for their new American Manufacturing Plant and Offices.

The Gaetano Companies negotiated the sale of a 4 1/2 acre parcel in the Charlestown Business Complex Parking Lot along with a Design/Build Butler Building Project. The facility consisted of a 60,000 square-foot Manufacturing Facility with an attached 2-story 7,000 square-foot Office and additional 3,500 square-feet of interior plant support space. The 28' height plant includes (5) loading docks, a 3,500 square-foot storage mezzanine, an 800 AMP electric service with an air rotation heat system.

The project broke ground in early July, 1997 and was completed in early January 1998 exceeding the owners occupancy date.

View more

General Millwork

A Design/Build Project consisting of a 20,000 square-foot warehouse, a 4,000 square-foot structural modification, re-roof and residing to an 80-year old rail siding building, and two new loading docks.

View more

Faster Form Corp.

This 65,000 square-foot design/build project for a floral gift company was completed in less than six months, replacing a multi-floor operation in a turn-of-the-century mill building. Owned by Lifesake, a Division of Faster-Form Corporation, the new facility provides an efficient, single-floor production, warehousing and sales office operation.

View more

Manth/Brownell

The original 28,000 square-foot building was designed and constructed in 1994. The owner had us return in 1998 to add another 12,000 square-feet. The building features a 90' clear span interior and a slab with metallic shake hardener finish.

View more

Mohawk Metal Products

In 1988, we completed a 22,000 square-foot manufacturing and office facility in less than four months on a design/build contract. Subsequently, we delivered a 9,000 square-foot manufacturing building with a bridge crane for the manufacturing of gas station canopies and fuel tanks. Then in 1997 and 1999, we added to the original facility a 10,000 square-foot manufacturing addition and a 5,000 square-foot office addition and renovation.

View more

Commercial

As an authorized Butler Builder®, we have designed and erected numerous commercial projects, including retail, office and community buildings. As experienced design/build professionals, we can complete your project quickly, managing every aspect of the project from design through construction or work with your architect, on a conventional design and price basis.

Utilizing conventional exterior materials our Butler buildings deliver aesthetically pleasing, durable, energy efficient facilities.

Utica College - Welcome Center

Utica College

After having abandoned a previous design that was over budget, we worked with the owner to develop a concept that met their budget and achieved a look that blended with the existing campus.

View more
Adirondack Harley Davidson

Adirondack Harley Davidson

The 24,000 sf Design-Build Butler building features a conventional structural steel display tower, stone and timber framed facade and window canopies with architectural standing seam roofing.

View more

PLC Trenching - Clinton, NY

PLC Trenching, LLC, based in Clinton NY, is a contracting company that owns, operates, and maintains specialty trenching and cabling equipment.  In 2006, they contacted us to design and build their first building to maintain the equipment. This project, a 13,000 sf custom Butler building had (2) 10-ton bridge cranes, (4) 2-ton jib hoists, with a machine shop, wash bay, storage mezzanine, and support offices, lunch rooms etc..  They quickly outgrew that building and had us return in 2008 to more than double that space to add another 13,000 sf shop with (2) more cranes and jib hoists, as well as a 3,200 sf prep and paint booth that can handle up to 50' equipment.  Later in 2008, we continued with a Butler custom-designed, conventionally framed 2-story 10,500 sf Office building attached to the original shop building.

 

The owner, Mr. David Critelli, wanted to use a "European" style in this building. The timing of the introduction of Butler's Azimuth siding system could not have come at a better time, as that was exactly the look he wanted, in a black color. We worked with our Architects, Alesia and Crewell, New Hartford, NY, to design the building around the Azimuth product and also to utilize the Koreteck wall system, which we have used on several projects. We included butt-glazed strip windows and solar shades to create the sleek look.  The interior finishes also follow the European look using polished granite floor tile, manufactured aluminum and cherry wood partitions, cherry wood ceilings, stainless steel railings, specialty lighting, and very high tech furniture systems. The building also uses water source heat pumps for a multi zone energy efficient HVAC system.

View more

Accelerate Sports

This 104,000 SF multi-purpose indoor sports complex is our largest Butler Building project in several years. The project includes a custom Butler structural system featuring a 155' clear span x 300' indoor turf soccer/lacrosse/baseball field with a 14' wide x 900' (4-lane) suspended running track overlooking the field.  Other indoor spaces include (3) full-size multi-purpose courts lined for basketball, volleyball and other sports, nine 70' long batting cages, four pitching lanes with mounds, a locker room with shower facilities, a pro shop, a fitness center, a team conference room, and a café/juice bar. 

View more

Harley Davidson of Utica - New York Mills, NY

When Harley Davidson of Utica (A Division of the Carbone Auto Group) needed a new facility, they turned to us to complete the Design-Build / Construction Management Services. We started work on the 24,000 square-foot Butler Building Facility in October 2002 and continued through the harsh winter of 2002-2003.  The grand opening of the high-profile motorcycle dealership and service center was held as planned on June 2, 2003.

 

Located in New York Mills, NY the building exterior features a wide variety of conventional and Butler Building products. Far from cookie-cutter uniformity, we achieved a unique appearance through the use of large aluminum storefront windows, cultured stone veneer, exposed wood timber trusses, cement board siding, Butler's "Snap-It" architectural roofing and the "Texture-Wall" insulated metal wall panel with an "EIFS / DRYVIT" type finish.

 

Inside the dealership, the more notable design features include an in-floor radiant heat system throughout, second floor mezzanines, and a ground concrete floor finish known as Retro-Plate.

 

This project shows the true diversity of the Butler-Building system and our ability to deliver high-quality, cost-efficient Design-Build / Construction Management Services.

View more

Alan Byer Volvo - Shop Addition & Showroom Renovations

We broke ground on the new 3,200 SF expansion of the existing service garage on May 5th. The addition is a pre-engineered building by Butler Manufacturing using their Shadowall siding and BR-II roof system.
The former shop area within the existing building will was transformed into a new service write-up lane, new car showroom, general manager's office & break room. 
The exterior of the existing masonry building was upgraded with new paint, architectural entrance canopies, horizontal gable end siding, and lighting. The owners also upgraded their existing road and building signage.

View more

Fiber Instruments - Whitesboro, NY

This negotiated Design/Build Butler Building Project is a 40,000 square-foot Corporate Headquarters and Warehouse. The Owner, Mr. Frank Giotto, and his staff brought to us preliminary plans in Mid-September of 2000. We presented our proposal for the Building Shell and Sitework with suggested modifications on 9/26/00 and received a Letter of Intent on 10/4/00.

 

The project proceeded immediately thereafter with site preparation, which included removal of over 7,000 cubic yards of organic materials and replacement with structural fill. Foundations and Butler Building erection proceeded through the harsh winter of 2000-2001. The Warehouse was enclosed in May/June, and the Sitework completed in July allowing the owner to occupy in early August. Having proceeded with the project through the winter months allowed the owner to occupy (4) months earlier than waiting until the following spring would have allowed.

 

The striking exterior of the 2-story 20,000 square-foot Office Building utilizes exterior insulation finish system, aluminum and glass, and ground face masonry units which shows the versatility of the Butler Building System.

View more

Birnie Bus

In February of 2007 we were contacted by Mr. Andy Thompson of the Birnie Bus Company, a School and Charter Bus company based in Rome NY, about building a new maintenance facility and offices for lease to their primary bus dealer, Leonard Bus Sales based in Deposit, NY, on a site in the Griffiss Technology Park.

The original intent was to construct the building in 2007, but several environmental and legal issues delayed the land purchase. The owner eventually resolved the issues and we were able to break ground in July of 2008. 

The 22,500 sf Butler building features (10) service bays with (2) bus lifts, high-efficiency lighting, a vehicle exhaust system, a pre-cast concrete Parts Mezzanine bearing on architectural concrete masonry and 4,600 sf Offices and Shop Support System.

View more

Remet Corporation - New Hartford, NY

This Design-Build 20,000 square-foot office building, which was completed in 1997, is the new corporate headquarters and product development laboratory for the REMET Corporation, suppliers to the casting industry.

The project was negotiated with Mr. James Pyne, Owner, as a turn-key development in conjunction with the land-owner, the Brian A. Gaetano Company.

 

The Butler Building structure features conventional exterior wall systems with ground face masonry units, light gauge framing, E.I.F.S. finish, and aluminum windows. The roof system is Butler MR-24 Standing Seam Metal with Butler's new all-inclusive twenty year "Weather Tight Cold Warrantee" that covers all roof transitions, flashing, and roof top equipment. The building interiors are Class "A" office space including "high end" finished, HVAC, and electrical systems.

View more

Teal's Express

Our first of several Design-Build projects for this northeast trucking company, this truck maintenance facility consists of 4 service bays, a wash bay, oil change pit, a pre-cast concrete storage mezzanine and offices.

Office Building and Renovation – A unique footprint, 2-story Butler building with corporate offices on second floor, support offices and renovations of original drivers areas.

View more

Players Theatre

Construction originally began in 2003 on this phased Design-Build Community Theater. The project is active once again and when completed will include two theaters, three rehearsal spaces, 200 seats for a main stage and 85 seats for a black box theater. The project includes (6) Butler Building Units and utilizes, Butler Texture Wall Panels, Architectural Masonry and Aluminum & Glass. (Picture above is a rendering / Project photos below taken March 2009)

View more

Utica General Trucking Company Inc.

In 1988, Utica General Trucking Company purchased a 40 year old structure to house its Peterbilt & GMC truck dealerships. The initial project included a 3,600 square-foot addition with 4 service bays, and complete renovation of the existing building interior and exterior. In 1994, 6 bays, including a drive-through wash bay, were added to the service building as part of the 4,500 square-foot addition. In 2000, a showroom and new Butler re-roof system over the old flat roof was added.

View more

Utica Plumbing Supply

Our work for the Utica Plumbing Supply Co. is a good example of the flexibilty of our Design-Build services. The owners of the business, (Howland Tank Supply of Ogdensburg, NY) came to us in the Fall of 2002 with a plan to relocate from their downtown Utica site and construct a new facility. Gaetano Construction was employed as the Design/Build contractor. In this role, we prepared the complete site and interior design, paving the way for the owner to contract with his own forces to complete the building's interior, mechanical and electrical work. The business in now housed in a new 14,500 square-foot sales office and warehouse facilty, featuring a high bay warehouse and two new loading docks.
 

View more

Utica Mack-Mitsubishi

This Desgin-Build project consisted of 3 additions and renovations including a 6,000 square-foot maintenance garage and a parts sales and office addition. Completed in 2000, this project shows our in house design and ability to match existing construction.

View more

Wal-Mart - Trailer Maintenance Addition

This 5,000 square-foot expansion to the Tractor-Trailer maintenance building was completed through the winter of 2006 and 2007. A design/build project, we worked with Wal-Mart corporate to complete the design which involved working over existing utilities and coordination with on-going operations.

The building utilized a new integral slab sealer known as Petrotex to prevent oil penetration. Existing mechanical and electrical systems were extended to the new addition.

View more

Glenwood Shopping Plaza

Our largest design/build Butler project to date, the 230,000 square-foot structure includes a 65,000 square-foot department store, a 42,000 square-foot grocery store, six secondary tenants, a movie theater and 32 other smaller retails shops. Owned by AMA Realty of Utica, NY, the strip shopping plaza and 1,200 car parking lot were completed entirely under our contract in under six months.

View more

Harley Davidson - New Bike & Storage Building

Our second project at this site, we completed a 6,000 square-foot motorcycle storage building, that has the capacity for over 300 bikes. It includes high bay lighting, heat, and wash equipment for off-season storage.

View more

Pep Boys Automotive

Owned by The PEP Boys, a Philadelphia-based company established in 1924, and a Butler Corporate account client, this 33,000 square-foot facility was completed in 1992 as part of the firm's northeast expansion efforts. The masonry bearing structure was built in just 110 days, and features 8 service bays and 25,000 square-feet of retail and warehouse space.

View more

Midstate Communications

This project consists of a 12,000 square-foot storage building as well as an 8,000 square-foot office addition and complete renovation of the original 30 year old metal building. Project features include residing, split face masonry, skylights and architectural metal canopy.

View more

Waste Management

This design/build project was completed in 1991 after a fire had destroyed the original structure. The 15,000 square-foot building includes 6,000 square-feet of offices, dispatch rooms, driver's lockers and a lunch room, as well as 9,000 square-feet for five service bays, a spray booth and a two bay drive-through wash area. Owned by Waste Management of New York (East Rochester, NY), the new facility was constructed over an old city ash landfill. The foundations consist of concrete caissons to a depth of 40 feet and a structural floor slab.

View more

Warehousing/Distribution

As an authorized Butler Builder® since 1982 we have completed nearly 3 million square-feet of new Butler and conventional Design/Build buildings and renovation projects.

Over the last 35 years, we have erected many manufacturing, warehousing and distribution facilities from 2,000 to 150,000 square-feet for satisfied clients throughout Central and Northern New York.

Our Design/Build service and self performing concrete and building erection crews assure the highest quality, fastest delivery, and competitiveness that our clients deserve.

McCraith Beverage

McCraith Beverages - New York Mills

We have just been given the go ahead on a major expansion for McCraith Beverages that includes (2) structures – a 14,250 square foot truck garage with a wash bay, and a 19,.000 square foot warehouse addition that connects the main facility to the former truck garage located in...

View more

Tri Valley Beverage

A $2.4 million Design/Build, Butler building, addition and renovation project is now complete. The scope includes a 12,000 square-foot Controlled Environment Warehouse, a 3,750 square-foot Office Addition, a 6,000 square-foot Garage addition, a new office entrance addition and complete renovations of the existing Offices and warehouse support areas.

The original facility, built in 1986, was one of our first major Butler projects. We returned in 1994 to add a 12,000 square-foot CEW addition, and have performed work at other locations for the owner, L.Knife & Sons of Kingston, Mass.

View more

Central Association for the Blind

For this longtime client, our most recent expansion at this site was a 20,000 square-foot warehouse expansion and loading dock building. Our first expansion to the original wood framed building in 1998 included a 16,000 square-foot addition and 15,000 square-foot re-roof with our Butler MR-24 standing seam roof system. The total area of this facility is now over 50,000 square-feet.

View more

Tri Valley Beverage - Keg Cooler Addition

This was our third expansion project for the facility that we built in 1986. A new 5,000 SF, 24' height refrigerated building addition to replace an aging interior keg cooler.

The Butler building utilizes 4" thick factory insulated metal panels and a 6" thick single ply roof system on metal decking. This is our first project utilizing ultra-high efficient LED lighting

We are proud to again serve our long standing client L.Knife and Sons, the owner of Tri- Valley Beverage.

View more
The Fountainhead Group, Inc.

The Fountainhead Group

This 80,000 square-foot warehouse/distribution expansion was designed and constructed by us in 2001, and completed in less than 5 months.

View more

Richer Feeds

Our first project for this feed production and distribution firm was in 1999 adding an 8,000 square-foot office and warehouse addition that reflected the companies headquarters. We followed over the next 3 years with a re-roof project as well as 2 concrete equipment foundations.

View more

Nirvana Spring Water - Boonville, NY

Work began in December of 2007 on a major expansion to the Nirvana Spring Water plant. We are serving as a Butler building, material, furnish, and erect contractor for this (5) unit, 98,000 square-foot expansion. The project includes (4) additions to the existing Production and Warehouse buildings as well as a new stand-alone 78,000 square-foot Warehouse.

View more
Northern Safety Co.

Northern Safety Co.

The original 90,000 square-foot facility, designed and built for Northern Safety Co., was completed in December 1998. We returned in 2000 to double the size of the warehouse bringing the total building area to 150,000 square-feet.

View more
Masonic Care Community

Masonic Care Community

A new 14,000 square-foot Facilities Storage Warehouse and Offices.

View more
ECR International

ECR International

In early June of 2009, we were contacted regarding a Design-Build proposal for a New Testing Lab for ECR's Boilers and Air Conditioning Equipment. 

View more

Grace Furniture

The Grace Furniture Warehouse Expansion is a 10,000 square-foot addition to their existing Marcy, NY facility. This project was constructed through the late fall and winter of 1999. To keep Grace Furniture in operation, we constructed the new warehouse over and around the existing masonry and wood framed warehouse, completed one-half of the new building so it could be occupied, then demolished the old building, and completed the new structure. Throughout the 6 month construction period, the Owner continued shipping and receiving goods without interruption.

View more

McCraith Beverages - Saranac Lake

The McCraith Beverage co. has awarded us a Design-Build contract to add a 14,000 sf Warehouse to the existing facility in Saranac Lake. The Butler building Warehouse will include an enclosed heated loading dock area, new dock equipment, an insulated fire separation wall, overhead doors and 10,000 sf of Warehouse area. The project also includes a 4,000 sf Butler Slope Build up Re-Roof area over the existing offices, a new Entry Vestibule, new metal siding at the exterior of the Offices, a complete exterior paint system, new interior metal liner panel, and new HVAC System for the Offices
We are glad to build for this past client again and look forward to working in the High Peaks area of the Adirondacks

View more

Conventional Design-Build

As experienced design/build professionals, we can complete not only Butler buildings but conventional projects as well. Managing every aspect of the project from design through construction our resume of completed conventional, design-build projects continues to grow.

Carbone Subaru

Carbone Auto Group - Subaru

Completed in 2018, our 10th major project for the Carbone Auto Group, we converted this 60 year old 30,000 sf former Chevrolet dealership, to a brand new state of the art Subaru dealership. Click here to read more......

View more

Carbone Auto Group - Collision Center

Completed in 2017 the new Carbone Collision Center and Fleet Sales facility is a 28,000 sf custom Butler building. From a concept plan provided by the paint equipment supplier, we developed In-house floor plans, building shell concept, site design, and budgets for the owner to consider.

To read more click here.....

View more

Carbone Auto Group

The project included major demolition and re-construction of the exterior front walls of each section – Offices have ground face masonry veneer and Omega Panel – the Recon/Auction has a split face masonry and EIFS exterior.

View more
Gilroy, Kernan, & Gilroy

Gilroy, Kernan, and Gilroy Insurance

The project included complete removal of all interiors and mechanical/electrical, a 60 seat training facility, 4 new toilet rooms, lunch room, secondary kitchen, a main conference room as well as several private offices and meeting rooms.

View more

ELG Utica Alloys

We have just completed a major Design-Build renovation project for ELG Utica Alloys. The company's locations in both Utica and Rome have relocated to the former 163,000 sf Curtains and Fabrics facility in Herkimer NY. The project included a complete roof replacement, renovations to the 16,000 sf Offices and Plant Restrooms, new Truck Access Doors and Truck Scale, Equipment foundations, and major Mechanical and Electrical work for the processing equipment. This is our second large project for Utica Alloys - we completed a build out of a 60,000 sf Shell building for their Titanium Processing division in 2006

View more

JH Rhodes - Relocation

In 2007 we met this specialty manufacturer of polishing pads for the glass and consumer electronics industry. We had originally proposed a new 60,000 sf facility in Clinton, adjacent to their existing plant. The economic collapse of 2008 cancelled that project.

 

In 2011 the company contacted us about an available vacant building that we happened to have built in 1970. The 82,000 sf vacant former Oneida Container building was in very good condition but would need a major renovation project.

 

We assembled a design and construction team to facilitate a complete renovation.

The project includes large production rooms and areas with new full height partitions, complete painting of all exposed steel, heavy duty epoxy floor painting, completely new HVAC including several new Roof Top units with plant air conditioning and ventilation, a new 1200 amp electrical service and power to new equipment as well as new Labs and some new Offices.

 

The project was completed in March of 2013

View more

Carbone - Pontiac/GMC

The Carbone Pontiac/GMC facility had a devastating fire on December 26, 2004, the Carbone family called on us to perform the emergency repairs to get the business up and running in just (3) days. We quickly assembled a design/build team and completed (3) additions totaling 10,500 square-feet and 14,000 square-feet of renovations.

View more

Carbone Crysler

Carbone Chrysler was a design/build project for Carbone Auto Group and was completed in February 2005 and includes a 14-bay Service/Wash Bay addition and a 4-bay Service Write up addition, entirely renovated Showroom and Offices, exterior facade and entry tower. The $1.5 million project was our third major contract with the Carbone Auto Group in the past 3 years. The work consolidates the Jeep, Chrysler, and Dodge franchises into one expanded location.

View more

MVCC Student Housing

A design-build $6 million, 3-story, 155-bed residence hall was completed August 2005. The 41,000 square-foot building is located next to existing student housing, enabling more than 400 of the college's 5000 students to live on campus. The architect chose a red brick exterior which coincides with the exterior of the existing student housing. The building will feature five-person suites with two double rooms and one-single room, along with a common gathering area and bathroom. Rooms are wired for Internet, telephone and cable-television services. Our company was selected on a design/build delivery system. Also we built two connecting links between the existing dorms to allow for better security and control for campus safety.

View more

Utica College - Tower Dorm

This 27,000 square-foot building was constructed of concrete plank and masonry bearing walls with brick and split face block veneer to the exterior. The building is fully air-conditioned and the project has a full fire protection system. Each floor has a common kitchen and lounge/study area. The construction time from design to final occupancy took 10 months.

View more

Utica College - Welcome Center

Utica College's new Welcome Center, serves as the first stop for prospective students and their families. After having abandoned a previous design that was over budget, we worked with the owner to develop a concept that met their budget and achieved a look that blended with the existing campus. The Design-Build project is a 5,500 sf custom Butler pre-engineered building with conventional exterior products including brick, blue stone, architectural metal, and aluminum/glass.

Some of the building's features include a Great Room with a 17' high ceiling and floor to ceiling Bluestone fireplace, six interview rooms for individual conferences with students and parents as well as a large open office area, conference room and lounge for faculty and staff The Great Room offers such amenities as wireless capabilities, USB Ports and audio-visual infrastructure for use by visiting families.

View more

Wilber Duck Chevy

In the spring of 2011, we sent out letters to local Chevrolet Dealerships asking if they were going to complete the renovations that were a new Image requirement from General Motors. The Wilber Duck dealership in Oneida responded and asked if we could meet with them. Following that meeting we prepared a budget based on the preliminary information from GM. We then offered our Design-Build Pre-Construction services to develop the drawings enough to prepare a more accurate budget.

In the fall of 2011, the owners accepted the budget. Through the winter, we completed the Architectural, Structural, Mechanical, and Electrical plans with our consulting Architect and Engineers. The plans were submitted and approved by GM. We then bid out the project to a qualified list of area sub-contractors and suppliers and finalized costs for the items we self-perform.

The project began in March and was completed in early November 2012. The renovations included a complete removal of the Showroom building exterior, structural modifications for the new storefront layout and new GM Standard Aluminum Panels and signage. Also included were 2 additions – one for New Car Delivery and a Service Entrance Canopy. A complete interior demolition and renovation of the Showroom, Sales, Business, and Executive Offices, Customer Waiting, Service Write Up and Parts Sale areas was completed. Also a new electrical service and completely new HVAC systems were installed.

We are glad to have led the design and construction renovating this 80 year old building giving it a brand new look that meets the new GM/Chevrolet standards. We will add this project to our growing list of completed Auto Dealership projects.

View more

Black River Outdoor Educational Center

This project is a 2,000 sf Office building to support the staff at this not-for-profit organization that teaches outdoor activities to young people. The building includes very high-level finishes, cedar-shake exterior, triple-glazed windows and doors, spray-foam insulation, pre-finished cherry interior walls, plaster ceiling, slate flooring, granite countertops, cherry cabinetry, a heat-recovery ventilator, high-efficiency boiler hot water baseboard heat with cast iron radiators, and custom lighting.

View more

Endodontics Association - New Dental Office

Another Design-Build renovation project has been completed for Endodontic Associates. This dental group has purchased an existing building at 5700 Commons Dr. in Dewitt. The project includes demolition of a 4,000 sf area for a new Endodontic practice including (6) new Operatory rooms and renovations to the Common area space. This is our second project for this client following the Utica office in 2003.

View more

Lucky Duck Vacation Rentals

Working for one of our long standing commercial clients, we completed the addition of a full second floor to (2) existing rental units that originally was part of an old beach front motel. Another Design-Build project - we removed the existing roof system and attic and added a full second floor with bedrooms and bathrooms.

View more

From small to large, we provide construction solutions for all types of projects in the Design-Build delivery method.