info@c2cconst.com | 315-801-5185 | 110 Lomond Court, Utica, NY 13502            Serving Oneida, Madison & Herkimer Counties

Butler Design-Build

Whether it's a Butler building for commercial, manufacturing, or warehousing and distribution, we assure the highest quality, fastest delivery, and competitiveness that our clients deserve.

As a Butler "Career Builder", we have completed nearly 3 million square-feet of Butler building projects for satisfied clients in Central and Northern NY, primarily on a Design-Build basis. 

Among the many clients and projects for which we have constructed Butler pre-engineered buildings include American Alloy Steel, Rome, NY; PLC Trenching, Clinton, NY; Harley-Davidson Stores for the Carbone Auto Group in Yorkville & Amsterdam, NY; Northern Safety Co., Meyda Tiffany, and Tri-Valley Beverage all in the Utica, NY area. We have also been involved in many other smaller projects and renovations of all sizes.

We normally self-perform all concrete foundation and building erection with our own forces, not sub-contractors.

Recreational/Athletic

Hamilton College Field House Expansion & Practice Facility

We have returned to Hamilton College to renovate the Practice Facility to install a curtain wall of windows and steel support to the existing walls.

Accelerate Sports

This 104,000 SF multi-purpose indoor sports complex is our largest Butler Building project in several years.

Manufacturing/Industrial

As a Butler Builder® since 1982, we have completed nearly 3 million square-feet of new Butler and conventional Design/Build buildings and renovation projects. Over the last 35 years, we have erected many manufacturing, warehousing and distribution facilities from 2,000 to 150,000 square-feet for satisfied clients throughout Central and Northern New York.

Cold Point - Rome, NY

After 2 years of design, planning, and financing for this project, located on a former Brownsite field in Rome, we are now completed with a new...

F.X. Matt's Brewery - Tank Farm Expansion

C2C Construction Solutions completed a contract to furnish and erect a 7,200 sf (2) story Mechanical building as part of Matt's major expansion of the Brewery on Edwards Street in Utica.

JBF Stainless

JBF Stainless

In 2017 , Jake Feldmeier, founder of JBF Stainless contacted us to look at (2) options for the growing business of Stainless Steel tanks for the Beverage Industry.

Precisionmatics Manufacturing Facility

Precisionmatics Manufacturing Facility

The Design-Build project is a (6) unit Butler building. The units include the Main plant, Offices, High bay for material receiving and storage with a bridge crane, a (6) Bay Scrap Dock, and Truck Canopy.

Syracuse Label

Syracuse Label

This project involved the construction of a new 63,000 SF facility that included a 49,000 SF Butler Building Production/Warehouse with a large 14,000 SF conventional built office area attached to the Butler Building that now houses their main operations.

Heidelberg Bread

This 28,800 SF Baking Facility for Heidelberg Bread, was the very first building in the Herkimer County IDA's "Pumpkin Patch" Industrial Park located in Frankfort, NY.

Commercial

As an authorized Butler Builder®, we have designed and erected numerous commercial projects, including retail, office and community buildings. As experienced design/build professionals, we can complete your project quickly, managing every aspect of the project from design through construction or work with your architect, on a conventional design and price basis.

Utilizing conventional exterior materials our Butler buildings deliver aesthetically pleasing, durable, energy efficient facilities.

Hale Transportation - Clinton, NY

This project, for Hale Transportation, A Tour and School Bus operator, expanded and renovated the current nearly 100-year-old building from 6,000 sf to 18,000 sf.

H.J. Brandeles Corporation

We served as the Prime Contractor for this Design Build 18,000 sf Butler Building.  Our contract included the foundations slab and Butler Building Shell, new Corporate Offices, Ship and Warehouse for H.J. Brandeles Mechanical Contractor features a custom designed insulated metal panels in multiple colors in both vertical & horizontal...

Utica College - Welcome Center

Utica College

After having abandoned a previous design that was over budget, we worked with the owner to develop a concept that met their budget and achieved a look that blended with the existing campus.

Adirondack Harley Davidson

Adirondack Harley Davidson

The 24,000 sf Design-Build Butler building features a conventional structural steel display tower, stone and timber framed facade and window canopies with architectural standing seam roofing.

PLC Trenching - Clinton, NY

PLC Trenching, LLC, based in Clinton NY, is a contracting company that owns, operates, and maintains specialty trenching and cabling equipment. In 2006, they contacted us to design and build their first building to maintain the equipment.

Harley Davidson of Utica - New York Mills, NY

When Harley Davidson of Utica (A Division of the Carbone Auto Group) needed a new facility, they turned to us to complete the Design-Build/Construction Management Services.

Warehousing/Distribution

As an authorized Butler Builder® since 1982 we have completed nearly 3 million square-feet of new Butler and conventional Design/Build buildings and renovation projects.

Over the last 35 years, we have erected many manufacturing, warehousing and distribution facilities from 2,000 to 150,000 square-feet for satisfied clients throughout Central and Northern New York.

Our Design/Build service and self performing concrete and building erection crews assure the highest quality, fastest delivery, and competitiveness that our clients deserve.

Inlet Marina & Lodging - Inlet, NY

We were contracted by the Owner of the Inlet Marina early in 2019 to discuss a Boat Storage building.  Over the next month we developed a plan for a 16,000 sf Butler "Classic building. 

McCraith Beverage

McCraith Beverages - New York Mills

This is our second project for McCraith Beverages in New York Mills.  We completed a major expansion and renovation at their Saranac Lake High Peaks Beverage facility in 2014.  This project in New York Mills included (2) Buildings and major site work was completed in spring of 2019.

 

Tri Valley Beverage

A $2.4 million Design/Build, Butler building, addition, and renovation project that included a 12,000 square-foot Controlled Environment Warehouse, a 3,750 square-foot Office Addition...

Central Association for the Blind

For this longtime client, our most recent expansion at this site was a 20,000 square-foot warehouse expansion and loading dock building.

Tri Valley Beverage - Keg Cooler Addition

This was our third expansion project for the facility that we built-in 1986. A new 5,000 SF, 24' height refrigerated building addition to replace an aging interior keg cooler.

The Fountainhead Group, Inc.

The Fountainhead Group

This 80,000 square-foot warehouse/distribution expansion was designed and constructed by us in 2001, and completed in less than 5 months.

From small to large, we provide construction solutions for all types of projects in the Design-Build delivery method.

Call UsRequest A Quote