

Construction Notes
F.X. Matt’s Brewing Company – Tank Farm Expansion
Utica, New York
Executive Project Manager: David Kleps
Project Manager: Lucas Saltsman
Superintendent: Luke Hamm
C2C Construction Solutions completed a prime Design-Build contract to furnish and erect a 7,200 sf (2) story Mechanical building as part of Matt’s major expansion of the Brewery on Edwards Street in Utica.
The new facility is custom-engineered, conventionally framed, structural steel Butler Building.
The exterior wall system utilizes factory insulated metal wall panels, roof system is EPDM with interior drains. This facility includes a mezzanine and interior pipe support bridge, all custom designed by Butler with information from Owner and coordinated thru our office.
The project scope also included I.M.P. siding of the new Tank Farm structure shown in background and the Pipe Bridge, as well as a Mechanical Shed roof in the rear.
The project was completed in Fall of 2019.