info@c2cconstructionsolutions.com | 315-801-5185 | 110 Lomond Court, Utica, NY 13502

Precisionmatics Manufacturing Facility

Precisionmatics Manufacturing Facility

Construction Notes

Precisionmatics Manufacturing Facility – 55,000 SF New Building ($2.1M)

West Winfield, New York

Executive Project Manager: David Kleps
Project Manager: Lucas Saltsman
Superintendent: Luke Hamm

We recently completed the Foundations, Slab, Butler building shell and Site Work for Precisionmatics’ new 55,000 sf Manufacturing and Office building on Rt. 20 in West Winfield. The Design-Build project is a (6) unit Butler building. The units include the Main plant, Offices, High bay for material receiving and storage with a bridge crane, a (6) Bay Scrap Dock, and Truck Canopy.

The building features Butler’s 2 ½” Therma-Wall factory insulated metal panels wall panels, an R-40 Energy Saver roof insulation system, ribbed horizontal metal panels, masonry veneer, aluminum-framed windows, a custom Entrance Canopy, and a perimeter red stripe – an owner’s suggestion that adds an interesting appearance.

We are continuing assisting the owner in finishing the interior of the building with various tasks such as drywall, interior windows, doors and millwork.

We congratulate the Pustay family on their new facility!

Additional Images

Precisionmatics Manufacturing Facility - Photo 1Precisionmatics Manufacturing Facility - Photo 2Precisionmatics Manufacturing Facility - Photo 3Precisionmatics Manufacturing Facility - Photo 4Precisionmatics Manufacturing Facility - Photo 5Precisionmatics Manufacturing Facility - Photo 6Precisionmatics Manufacturing Facility - Photo 7

From small to large, we provide construction solutions for all types of projects in the Design-Build delivery method.