Construction Notes
Syracuse Label & Surround Printing – New Building
Syracuse, New York
Executive Project Manager: David Kleps
Project Manager: Rob Munson
Superintendent: John Foster
This project involved the construction of a new 63,000 SF facility that included a 49,000 SF Butler Building Production/Warehouse with a large 14,000 SF conventional built office area attached to the Butler Building that now houses their main operations.
The $7.6 Million project had an aggressive 6 month construction schedule with liquidated damages. Site work commenced on May 9, 2016 and substantial completion. The ensuing Certificate of Occupancy was attained on October 31, 2016.
Some of the features of the new Production/Warehouse space included several large Bridge cranes, (2) new Loading docks with Dock Levels, a new Dimplex Chiller to help in their printing operations, new LED lighting and several large curtain walls to allow the influx of natural lighting.
The office space is complete with a new lobby/reception area, (2) large conference rooms, (2) open office areas complete with a dehumidification/misting system, several large individual office that run the perimeter of the office space, and a Showcase Room that will allow the owner to display numerous awards.