info@c2cconst.com | 315-801-5185 | 110 Lomond Court, Utica, NY 13502
Wooden texture with color overlay

McCraith Beverage - Saranac Lake

McCraith Beverage - Saranac Lake

Construction Notes

McCraith Beverages – High Peaks Distributing – Addition & Renovations

Saranac Lake, New York

Executive Project Manager: David Kleps
Project Manager: Lucas Saltsman
Superintendent: Jim Bailey

The McCraith Beverage co. has awarded us a Design-Build contract to add a 14,000 sf Warehouse to the existing facility in Saranac Lake. The Butler building Warehouse will include an enclosed heated loading dock area, new dock equipment, an insulated fire separation wall, overhead doors and 10,000 sf of Warehouse area. The project also includes a 4,000 sf Butler Slope Build up Re-Roof area over the existing offices, a new Entry Vestibule, new metal siding at the exterior of the Offices, a complete exterior paint system, new interior metal liner panel, and new HVAC System for the Offices
We are glad to build for this past client again and look forward to working in the High Peaks area of the Adirondacks.

Additional Images

McCraith Beverage - Saranac LakeMcCraith Beverage - Saranac LakeMcCraith Beverage - Saranac Lake

From small to large, we provide construction solutions for all types of projects in the Design-Build delivery method.