Manufacturing

As a Butler Builder® since 1982, we have completed nearly 3 million square-feet of new Butler and conventional Design/Build buildings and renovation projects. Over the last 35 years, we have erected many manufacturing, warehousing and distribution facilities from 2,000 to 150,000 square-feet for satisfied clients throughout Central and Northern New York.

JBF Stainless

JBF Stainless

In 2017 , Jake Feldmeier, founder of JBF Stainless contacted us to look at (2) options for the growing business of Stainless Steel tanks for the Beverage Industry. Having been located in a leased facility we looked at expansion in to the adjacent vacant space with an addition vs. a totally new facility. After working up figures on both it was decided to pursue the new facility on a site in Frankfort  NY at the "Pumpkin Patch" Industrial Park, adjacent to Heidelberg Bread,  which we built in 2016. Construction started in the spring of 2018 and was completed in December of 2018

The unique 43,000 sf facility includes a 60' clear height High Bay Fabrication and Shipping  area with (4) 15 ton Bridge cranes, which allows fabrication of the large tanks vertically. The Low Bay area includes (2) Gantry cranes, smaller equipment, and a Receiving area. Also included is a 3500 sf Office Headquarters with a Storage Mezzanine above.

Congratulations to the team at JBF for the move to the new facility.    

 

View more
Precisionmatics Manufacturing Facility

Precisionmatics Manufacturing Facility

The Design-Build project is a (6) unit Butler building. The units include the Main plant, Offices, High bay for material receiving and storage with a bridge crane, a (6) Bay Scrap Dock, and Truck Canopy.

View more
Syracuse Label

Syracuse Label

This project involved the construction of a new 63,000 SF facility that included a 49,000 SF Butler Building Production/Warehouse with a large 14,000 SF conventional built office area attached to the Butler Building that now houses their main operations.

 

The $7.6 Million project had an aggressive 6 month construction schedule with liquidated damages. Site work commenced on May 9, 2016 and substantial completion. The ensuing Certificate of Occupancy was attained on October 31, 2016.

 

Some of the features of the new Production/Warehouse space included several large Bridge cranes, (2) new Loading docks with Dock Levels, a new Dimplex Chiller to help in their printing operations, new LED lighting and several large curtain walls to allow the influx of natural lighting.

 

The office space is complete with a new lobby/reception area, (2) large conference rooms, (2) open office areas complete  with a dehumidification/misting system, several large individual office that run the perimeter of the office space, and a Showcase Room that will allow the owner to display numerous awards.      

View more

Heidelberg Bread

This 28,800 SF Baking Facility for Heidelberg Bread, was the very first building in the Herkimer County IDA's "Pumpkin Patch" Industrial Park located in Frankfort, NY. The building replaces the original Heidelberg plant in Herkimer which the company had outgrown due to its continued growth and high demand for the artisan bread products they have produced since 1983.

 

The project was completed on a Design-Build basis that included Site, Structural, Architectural and Mechanical/Electrical design and construction. The building includes separate Production and Packaging areas, Hi-R value Insulated Metal Wall and Roof Panels, Staff offices and support facilities.

View more
American Alloy Steel

American Alloy Steel 2015 Expansion

The 63' x 325' addition includes (2) 20 ton bridge cranes, for a total of (8) cranes in the facility. We are proud to continue our relationship with this Houston, Texas based client.

View more
Feldmeier Equipment

Feldmeier Equipment

In February 2014, we completed the construction of the new 44,000 sf Manufacturing Plant for Feldmeier Equipment in Little Falls.

View more

SR Sloan

Our relationship with this client began in 1999, when Mr. Steve Sloan began pursuit of expanding or relocating his families' wood truss and stair business, which was located in several small buildings which they were outgrowing rapidly.

 

Over the next few years, we pursued expansion at the existing site, a new site near the existing, and relocation to an existing vacant plant. In 2005, we put Mr. Sloan together with a local land owner and site contractor, Mr. Fred Burrows Jr., who owned a new 100 acre site, at the intersection of the new Judd Rd. extension, NYS 840, and Halsey Rds. in Whitestown, and eventually negotiated this new 63,000 square-foot Design-Build project. This was the first project at this site which now includes a new access road, utilities, and space for future development.

 

The state of the art facility includes 35,000 square-feet of Truss Production, 4,000 square-foot Truck Maintenance area, a 15,000 square-foot Stair fabrication shop, 7500 square-feet of new Office and Plant support rooms, a 5 acre exterior material storage area, and new manufacturing equipment.

View more

Utica Converters

After years of legal and environmental delays, finally in the year 2000 the City of Utica demolished the abandoned factory and prepared the site for re-development. We teamed with Butler Real Estate to offer a Design/Build-Lease project that was ultimately accepted by the City, the NYS D.E.C., and Utica Converters. The 96,000 square-foot project was completed in less than 6 months, a month ahead of schedule.

 

Utica Converters, a subsidiary of Goodyear Tires of North America, produces polyester cord materials used in tires and will add several jobs due to this expansion.

View more

F.X. Matt's Brewery - Bio Digester

We have completed (2) Buildings, Foundations, and Site Work for this exciting "Green" project that will process the brewery's waste water to produce methane gas that will in turn power a generator that will provide up to 50% of the electrical needs of the brewery. 

We served as the Design-Builder for the 5,000 sf Pump House, the 2,000 sf Bio-Gas Storage including a 12,500 cubic foot concrete containment tank, and (2) Large Tank Foundations, one 280 cy and another 165 cy, as well as the complete Site Work for Utilities, Storm Water and Site Improvements.

Lead designer of the Digester System is EMG International based in Philadelphia, Pa. 

We are proud to have served the brewery again following the new Warehouse and Fire Re-Construction in 2009.

View more

Meyda Tiffany

This 83,500 square-foot Butler Building expansion for Meyda Tiffany in Yorkville, NY began on site in early August of 2000. The planning process, however, began nearly (2) years earlier when the owner of this manufacturer and distributor of stained glass products, contacted our office to discuss his expansion needs. The relationship between our firms had begun in 1993 when Meyda purchased an abandoned 60,000 square-foot facility and contacted us to replace a 24,000 square-foot area with a new pre-engineered building. We were successful in completing that design/build project and were able to build on our relationship to obtain this new project, which will more than double the size of the current facilities. The new project includes a 63,380 square-foot manufacturing and warehouse area with a 5,600 square-foot first floor showroom, 5,600 square-foot second floor photography and office area, as well as a 7,800 square-foot warehouse mezzanine. Once the showroom is complete, we will renovate the existing offices and showroom to a new 7,000 square-foot office area. The warehouse and manufacturing area is scheduled for completion in December 2000, the showroom for February, and the office renovations for April 2001.

View more

F.X. Matt's - Tanker Dock Addition

We have continued our relationship with the FX Matt Brewing Co.  to design and build this small but important addition to facilitate Tanker trucks that deliver and ship beer to the facility.

 

The Butler addition includes room for (2) Tanker trucks with provisions for oil/water separation and containment, wash down, ventilation, heat and electrical.

 

View more

Empire Recycling

A 7,000 square-foot Butler building to house bulk aluminum for processing by a new shredding machine, was completed in 2007. The project included installation of over (230) wood and steel piles to support both the building and the exterior equipment. Following completion of the piles, we installed over (230) cy of concrete for building and equipment foundations, as well as structural slabs.

The Load Out building featured a 30' eave height, clear span, with 12' high concrete and steel protection walls.

Upon completion of the building, we also completed a re-siding project of the original storage buildings to match the look of the new building.

View more

Mobile Climate Control

In the Spring of 1997, Mobile Climate Control Corporation, a Toronto, Ontario based Manufacturer of heating and air conditioning systems for Urban Transit and Military Vehicles sought a N.Y.S. site for their new American Manufacturing Plant and Offices.

The Gaetano Companies negotiated the sale of a 4 1/2 acre parcel in the Charlestown Business Complex Parking Lot along with a Design/Build Butler Building Project. The facility consisted of a 60,000 square-foot Manufacturing Facility with an attached 2-story 7,000 square-foot Office and additional 3,500 square-feet of interior plant support space. The 28' height plant includes (5) loading docks, a 3,500 square-foot storage mezzanine, an 800 AMP electric service with an air rotation heat system.

The project broke ground in early July, 1997 and was completed in early January 1998 exceeding the owners occupancy date.

View more

General Millwork

A Design/Build Project consisting of a 20,000 square-foot warehouse, a 4,000 square-foot structural modification, re-roof and residing to an 80-year old rail siding building, and two new loading docks.

View more

Faster Form Corp.

This 65,000 square-foot design/build project for a floral gift company was completed in less than six months, replacing a multi-floor operation in a turn-of-the-century mill building. Owned by Lifesake, a Division of Faster-Form Corporation, the new facility provides an efficient, single-floor production, warehousing and sales office operation.

View more

Manth/Brownell

The original 28,000 square-foot building was designed and constructed in 1994. The owner had us return in 1998 to add another 12,000 square-feet. The building features a 90' clear span interior and a slab with metallic shake hardener finish.

View more

Mohawk Metal Products

In 1988, we completed a 22,000 square-foot manufacturing and office facility in less than four months on a design/build contract. Subsequently, we delivered a 9,000 square-foot manufacturing building with a bridge crane for the manufacturing of gas station canopies and fuel tanks. Then in 1997 and 1999, we added to the original facility a 10,000 square-foot manufacturing addition and a 5,000 square-foot office addition and renovation.

View more

From small to large, we provide construction solutions for all types of projects in the Design-Build delivery method.