info@c2cconst.com | 315-801-5185 | 110 Lomond Court, Utica, NY 13502

Manufacturing/Industrial

As a Butler Builder® since 1982, we have completed nearly 3 million square-feet of new Butler and conventional Design/Build buildings and renovation projects. Over the last 35 years, we have erected many manufacturing, warehousing and distribution facilities from 2,000 to 150,000 square-feet for satisfied clients throughout Central and Northern New York.

JBF Stainless

JBF Stainless

In 2017 , Jake Feldmeier, founder of JBF Stainless contacted us to look at (2) options for the growing business of Stainless Steel tanks for the Beverage Industry.

View more
Precisionmatics Manufacturing Facility

Precisionmatics Manufacturing Facility

The Design-Build project is a (6) unit Butler building. The units include the Main plant, Offices, High bay for material receiving and storage with a bridge crane, a (6) Bay Scrap Dock, and Truck Canopy.

View more
Syracuse Label

Syracuse Label

This project involved the construction of a new 63,000 SF facility that included a 49,000 SF Butler Building Production/Warehouse with a large 14,000 SF conventional built office area attached to the Butler Building that now houses their main operations.

View more

Heidelberg Bread

This 28,800 SF Baking Facility for Heidelberg Bread, was the very first building in the Herkimer County IDA's "Pumpkin Patch" Industrial Park located in Frankfort, NY.

View more
American Alloy Steel

American Alloy Steel 2015 Expansion

The 63' x 325' addition includes (2) 20 ton bridge cranes, for a total of (8) cranes in the facility. We are proud to continue our relationship with this Houston, Texas based client.

View more
Feldmeier Equipment

Feldmeier Equipment

In February 2014, we completed the construction of the new 44,000 sf Manufacturing Plant for Feldmeier Equipment in Little Falls.

View more

SR Sloan

The new facility includes 35,000 square-feet of Truss Production, 4,000 square-foot Truck Maintenance area, a 15,000 square-foot Stair fabrication shop, 7500 square-feet of new Office and Plant support rooms, and a 5-acre exterior material storage area.

View more

Utica Converters

The 96,000 square-foot Utica Converters project was completed in less than 6 months, a month ahead of schedule. They will be able to add several jobs due to this expansion.

View more

F.X. Matt's Brewery - Bio Digester

We have completed Buildings, Foundations, and Site Work for this exciting "Green" project that will process the brewery's wastewater to produce methane gas that will power a generator that will provide up to 50% of the electrical needs of the brewery.

View more

Meyda Tiffany

This 83,500 square-foot Butler Building expansion for Meyda Tiffany in Yorkville, NY began on site in early August of 2000.

View more

F.X. Matt's - Tanker Dock Addition

We have continued our relationship with the FX Matt Brewing Co. to design and build this small but important addition to facilitate Tanker trucks that deliver and ship beer to the facility.

View more

Empire Recycling

A 7,000 square-foot Butler building was completed in 2007. Upon completion of the building, we also completed a re-siding project of the original storage buildings to match the look of the new building.

View more

Mobile Climate Control

In 1997, Mobile Climate Control Corporation, a Toronto, Ontario based Manufacturer of heating and air conditioning systems for Urban Transit and Military Vehicles sought a N.Y.S. site for their American Manufacturing Plant and Offices.

View more

General Millwork

A Design/Build Project consisting of a 20,000 square-foot warehouse, a 4,000 square-foot structural modification, re-roof and residing to an 80-year old rail siding building, and two new loading docks.

View more

Faster Form Corp.

This 65,000 square-foot design/build project for a floral gift company was completed in less than six months, replacing a multi-floor operation in a turn-of-the-century mill building.

View more

Manth/Brownell

The original 28,000 square-foot building was designed and constructed in 1994. The owner had us return in 1998 to add another 12,000 square-feet. 

View more

Mohawk Metal Products

In 1988, we completed a 22,000 square-foot manufacturing and office facility in less than four months on a design/build contract.

View more

From small to large, we provide construction solutions for all types of projects in the Design-Build delivery method.