
Carbone Auto Group - Subaru
Completed in 2018, our 10th major project for the Carbone Auto Group, we converted this 60-year-old 30,000 sf former Chevrolet dealership, to a brand new state of the art Subaru dealership.
From small damage repairs to larger interior and exterior renovations, we complete many projects from owner provided sketches or in-house design-build.
Past construction and renovation projects include:
We provide pre-construction budgeting and in-house Auto-Cad drafting. If the project is feasible we move to final design and pricing, working with interior designers and architectural firms for space planning and code compliance.
This is a video of progress on a recent Design-Build Renovation project for a local manufacturer – start to finish of a major renovation of Bathrooms and Locker rooms at a 50+ year old facility.
As experienced design/build professionals, we can complete not only Butler buildings but conventional projects as well. Managing every aspect of the project from design through construction our resume of completed conventional, design-build projects continues to grow.
Completed in 2018, our 10th major project for the Carbone Auto Group, we converted this 60-year-old 30,000 sf former Chevrolet dealership, to a brand new state of the art Subaru dealership.
Completed in 2017 the new Carbone Collision Center and Fleet Sales facility is a 28,000 sf custom Butler building.
The project included major demolition and re-construction of the exterior front walls of each section – Offices have ground face masonry veneer and Omega Panel – the Recon/Auction has a split face masonry and EIFS exterior.
The project included complete removal of all interiors and mechanical/electrical, a 60 seat training facility, 4 new toilet rooms, lunch room, secondary kitchen, a main conference room as well as several private offices and meeting rooms.
We have just completed a major Design-Build renovation project for ELG Utica Alloys. The company's locations in both Utica and Rome have relocated to the former 163,000 sf Curtains and Fabrics facility in Herkimer NY.
In 2011 the company contacted us about an available vacant building. The 82,000 sf vacant former Oneida Container building was in very good condition but would need a major renovation project.
View All Conventional Design-Build Projects
As part of Special Metals ongoing facility upgrades, we are currently working on the transformation of their existing Plant and Barmill Bathroom/Locker Room spaces.
The Carbone Auto Group has been one of our major clients over the past 10 years. This was our 8th major project for them.
We have completed another project for the Carbone Auto Group. Renovations and addition were started in June of 2018 to the facility we constructed in 2008.
Having built the 160,000 sf corporate headquarters, we have completed the transformation of the neighboring 63,000 sf building that we previously built back in 1993 for the Faster Form Co.
We completed a total building renovation including a 6,000 sf Keg Cooler, New Offices, Lunch and Toilet Rooms, new dock doors and equipment, lighting, heating and ventilation systems.
The project includes demolition of a 4,000 sf area for a new Endodontic practice including (6) new Operatory rooms and renovations to the Common area space.