info@c2cconst.com | 315-801-5185 | 110 Lomond Court, Utica, NY 13502            Serving Oneida, Madison & Herkimer Counties

Our Team

Richard Jones

Superintendent

Dick Jones has been a Project Superintendent for over 25 years.

 

As Superintendent, Mr. Jones coordinates the activities of all site contractors, assuring compliance with Architect/Engineer drawings and specifications. Mr. Jones is an expert carpenter and has a strong background with building mechanical and electrical systems. He also maintains compliance with OSHA mandates and federal, state and local zoning ordinances while maintaining the job schedule. An important part of Mr. Jones role as superintendent is being a communication link between the project manager, owner and all subcontractors while supervising on site workers.

Select Projects

Carbone Auto Group , Utica, NY
Collision Center - $3M - 25,000 SF custom Butler Building & Component Offices
Recon/Auction - $2.5M - Reconstruction of former grocery store.

J H Rhodes-Relocation to Vernon, NY - $2.1M - 82,000 SF Renovation Complete renovation to a vacant building. The project included large production rooms and areas with new full height partitions, complete painting of all exposed steel, heavy duty epoxy floor painting, completely new HVAC including several new Roof Top units with plant air conditioning and ventilation, a new 1200 amp electrical service and power to new equipment as well as new Labs and some new Offices.

 

Gilroy, Kernan, and Gilroy Insurance, Clinton, NY - $1.1M – A design-build project that included complete removal of all interiors and mechanical / electrical, a 60 seat training facility, 4 new toilet rooms, lunch room, secondary kitchen, a main conference room as well as several private offices and meeting rooms. The finishes included an upgraded ceiling system with drywall soffits, 8’ high doors, carpet tiles and ceramic tiles. The exterior features a new Alucobond entrance canopy, new aluminum windows and doors and landscaping.

 

Carbone Honda – Sales and Service Facility, Yorkville, NY - $2.9M – A design-build conventional steel framed building features an expansive showroom, enclosed service reception area, bay service garage with diamond polished floor slabs and Petrotex sealer, an in floor radiant heat 8,000 sf second floor office area, parts storage and mechanical room that stores waste oil for primary heating fuel. The exterior features the distinctive Honda Wave canopy and Alucobond circular entry element.

 

Carbone Pontiac / GMC, Yorkville, NY - $1.7M - Emergency repairs were made after this facility suffered a devastating fire. We quickly assembled a design-build team and completed (3) additions totaling 10,500 sf and 14,000 sf of renovations.

Carbone Chrysler, Yorkville, NY - $1.5M – A design-build project included a 14-bay service / wash bay addition and a 4-bay service write-up addition, entirely renovated showroom and offices, exterior façade and entry tower.

Harley Davidson of Utica, New York Mills, NY - $1.2M – A design-build / construction management 24,000 SF building for Carbone Auto Group. The building features a wide variety of conventional and Butler exterior finishes including cement board siding, exposed wood trusses, architectural metal roofing, large storefront windows, cultured stone veneer, as well as Butler Texturewall panels.

Education / Training

  • AAS Morrisville State College
  • AGC Supervisory Training Program
  • Butler Mfg. Certified Roof Installer
  • OSHA 30 Hour Safety Certified
Richard Jones

From small to large, we provide construction solutions for all types of projects in the Design-Build delivery method.

Call UsRequest A Quote